Windarra Estate – Stage 1
This project involved the construction of a 61 Lot Rural Residential Development incorporating two 12m span Concrete Arches, 100 acres of protected parklands, creeks and environmental reserves.
The project lasted 40 weeks and demanded constant environmental consideration and construction contraints to enable the overall unique project outcomes.
Brisbane Markets – Stage B
Civil Unlimited were involved in the construction of a four lane, fully signalised intersection on a high volume and heavy loaded road. Construction was performed on very low subgrade CBR materials.
This project evolved constantly, with close communications kept at all times with the Consulting Engineer and Client to design and incorporate Brisbane Markets Limited's communications and logistical support requirements.